Picture Gallery Two Of Two The following pictures typify the scope and style of projects that
we undertake on a regular basis.
Click picture for close up view
ITEM 2-1 Final pre shipment inspection
This skid was being checked per spec to assure that upon arrival it would
meet the standards as specified by the end user.
ITEM 2-2 On site piping project. VANWIN prides themselves on being able
to meet the demands as the primary piping contractor for a national compressor
manufacture. Although the piping tends to be "test Specific" safety and adherence
to cleanliness and performance parameters is vital.
ITEM 2-3 On site piping project. VANWIN prides themselves on being able
to meet the demands as the primary piping contractor for a national compressor
manufacture. Although the piping tends to be "test Specific" safety and adherence
to cleanliness and performance parameters is vital.
ITEM 2-4 Weldment Upgrade Division. Shown here is an employee in the "Grind
Shop" precision grinding the manufacturer's welds. The centrifugal impellers
range in size from 18" dia. to over 7'
ITEM 2-5 Weldment Upgrade Division. This impeller shows the precise nature
that can be achieved.