Picture Gallery Two Of Two
The following pictures typify the scope and style of projects that we undertake on a regular basis.

Click picture for close up view


ITEM 2-1
Final pre shipment inspection

This skid was being checked per spec to assure that upon arrival it would meet the standards as specified by the end user.



ITEM 2-2
On site piping project.
VANWIN prides themselves on being able to meet the demands as the primary piping contractor for a national compressor manufacture. Although the piping tends to be "test Specific" safety and adherence to cleanliness and performance parameters is vital.



ITEM 2-3
On site piping project.
VANWIN prides themselves on being able to meet the demands as the primary piping contractor for a national compressor manufacture. Although the piping tends to be "test Specific" safety and adherence to cleanliness and performance parameters is vital.



ITEM 2-4
Weldment Upgrade Division.
Shown here is an employee in the "Grind Shop" precision grinding the manufacturer's welds. The centrifugal impellers range in size from 18" dia. to over 7'



ITEM 2-5
Weldment Upgrade Division.
This impeller shows the precise nature that can be achieved.


next